Client: Heineken Breweries
Location: Addis Ababa, Ethiopia
Execution Period: 2014 - 2019
The largest brewery project in Ethiopia, with the construction of: - • Over 30,000 m² packaging area • Over 20,000 m² storage space • Brewhouse and Utility buildings, over 8,000 m² • Totaling over 1,500 meters in length of pipe bridges. We deployed: • More than 150,000 mechanical fitters working hours • Over 30,000 equipment operating hours, for work at height and lifting operations.
Client: Brown Food Plc
Location: Debrebrhan, Ethiopia
Execution Period: May, 2024 – July, 2025
Complete mechanical and Electrical installation of storage, cleaning, and milling plant in collaboration with the renowned Swiss technology provider, Bühler Group. This high-precision project includes the full installation of: • Grain storage systems (in total 8 silos) • Cleaning and pre-processing units • Advanced milling machinery and process lines
Client: Soufflet Group
Location: Addis Ababa, Ethiopia
Execution Period: February 2021 - on going
Installation of Soufflet Group Malting Plant in Addis Ababa, Bole Lemi Industrial Park. This project was executed in collaboration with Bühler Group. Our scope of work included: • Installation of selected malting silos • Installation of conveyor systems for grain handling • Fabrication and installation of all maintenance platforms in the machine tower • Cladding installation for 6 malting silos
Client: Kegna Beverages
Location: Ginchi, Ethiopia
Execution Period: November, 2023 – September, 2025
Electrical and Mechanical installation of Kegna Beverages which is a brewery having a capacity of 3 million hector liters annually. Installation of fermentation tanks, brewhouse, utilities, packaging equipment and malt handling area including storage silos, by providing all lifting equipment from 160t cranes all the way to forklifts and access platforms. More than 200 skilled and non-skilled workers have been deployed.
Client: Bootmalt Ethiopia
Location: Debrebrhan, Ethiopia
Execution Period: January 2019 – April 2021
- Installation of the Barley and Malt Towers (32 meters in height each) and the Steeping House - Construction of Seed Storage, Malt Bagging, and Utility Buildings - Installation of Green Barley Silos – 2 units (each 32m diameter × 16m height) - Installation of Malting Storage Silos – 16 units (each 10m diameter × 14m height) - Installation of Catwalks, Conveyor Systems, Elevators...
Client: Heineken Breweries
Location: Gisenyi, Rwanda
Execution Period: October, 2022 – November, 2023
- This project is for Bralirwa, a subsidiary of Heineken Breweries in near lake Kivu in Rwanda. - The project is a construction of a 2,780 m² glass bottle line, prefabricated building and installation of lightning attestor, fire alarm and data system. - It is our first international project we have executed in Gisenyi, Rwanda with Remco International B.V. - This milestone reflects the trust our clients place in us to deliver reliable, high-standard industrial installations.